SimplyTough™ Polymeric Sand
At SRW Products, our SimplyTough™ polymeric sand is intended to tackle all your hardscape projects, even porcelain. The long-lasting, flexible, and easy activation formula works in a variety of paver joints and doesn’t require timed wetting for activation – allowing you to work at your own pace.
- ONE easy-to-use sand for ALL your needs
- No time constraints for activation (wetting)
- You can work in areas up to 500 sq. ft. at a time, providing the surface stays wet
- Resists sand-loss, weeds, and insects
- Long Lasting
- Flexible
- Does not contain Portland, Fly Ash or Crushed Limestone which can cause hazing
- Admix is lightly bonded to the sand creating a haze and dust free formula
- Will not dust when opened or applied to the project surface
- Available in tan and granite colors
- This sand is SimplyTough™!
- Porcelain Tile
- Concrete Pavers
- Natural Stone
- Driveways
- Walkways
- Patios
- Pool Decks
- Concrete Overlays
SimplyTough™ Polymeric Sand
PART NUMBER | COLOR | SIZE | QUANTITY |
SSAN ST TAN | TAN | 50 LB BAG | 49 BAGS/PLT |
SSAN ST GRA | GRANITE | 50 LB BAG | 49 BAGS/PLT |
CONTRACTORS: If you are a contractor looking to try one of our products, click here for a dealer in your area, or click here to connect with your local sales rep for a demo.
DEALERS: If you are a dealer looking for an in-store demo or to bring a product in, click here to find your local sales rep.
HOMEOWNERS: If you are a homeowner, click here to find a dealer in your area.
Simplytough™ Instructions
Preparation
- Install pavers using the manufacturer’s guidelines for bedding, leveling & installation. Fully clean off debris from the project area.
- Installations should have a proper drainage layer of sand with a depth of 1” (2.54 cm).
- Concrete overlays require a 1” sand layer in addition to proper drainage including slope, weep holes and through the perimeter of the project.
- Compact pavers thoroughly using a rubber-plated compactor.
- If the compactor is not rubber-plated, cover pavers with a woven fabric while compacting to help protect the paver surface from damage.
- Pavers must be completely dry before installing polymeric sand. Wait 24 hours after rain.
- Install pavers using the manufacturer’s guidelines for bedding, leveling & installation. Fully clean off debris from the project area.
Application
- Gently tumble the bag, then cut the bottom and apply SimplyTough™ evenly over the surface.
- Spread sand into joints, completely filling to the full depth of the pavers.
- Avoid pushing sand over long distances.
- Remove excess sand from the surface of the pavers before compacting.
- Compact filled joints using a rubber-plated compactor.
- For natural stone or porcelain tile use a vibratory rubber roller or rubber mallet to settle sand on the edge of the material.
- If joints settle more than ¼” reapply SimplyTough™ by following the previous application steps again.
- Remove excess sand from the paver surface using a soft bristle broom and set the joint height while removing residue with a leaf blower on idle.
- Once complete, joint height should be filled to ⅛” (.32 cm) below the top of the paver.
Activation
- Working in areas of 350 – 500 sq. ft. (46.45 sq. m.). Lightly mist the paver surface. Once the surface is wet, do not let the surface dry out until activation is complete.
- Wait 3 minutes and repeat this process 3-4 times leaving 3 minutes in between while gradually increasing water flow & making sure to avoid pooling of surface or joints.
- The final watering should supply enough water to rinse off any residual material from the pavers. Use a blower if any remains.
- Use a screwdriver to test for proper moisture depth of at least 1½” (1.27 cm). If depth is not achieved, immediately wet the area with a shower setting.
- Once moisture depth is achieved, blow off excess water using a leaf blower.
- Working in areas of 350 – 500 sq. ft. (46.45 sq. m.). Lightly mist the paver surface. Once the surface is wet, do not let the surface dry out until activation is complete.
Curing
- Curing process varies and may take up to 24 hours to set.
- Lower temps and increased humidity levels will increase set times.
- Wait 28 days prior to cleaning or sealing.
- Curing process varies and may take up to 24 hours to set.
User-Tips
- USAGE NOTES
- Test in a small discrete area.
- Do not use this product on damp or wet surfaces. Doing so will affect the product’s performance by adhering to the surface making it difficult to remove.
- Not for use on clay pavers or pool copings.
- Proper compaction is critical for obtaining optimal joint strength.
- JOINT SIZE/TYPE
- Recommended for joints between 1/8” to 3/4” (.32 cm to 1.90 cm), 1” at intersecting points.
- Minimum joint depth: 1½” (3.81 cm).
- When using SimplyTough™ with porcelain, simply make sure it’s the full depth of the porcelain.
- COVERAGE
- Narrow Joints: Typical coverage is 55 – 75 sq. ft. (5.11 – 6.97 sq. m.) per bag.
- Wide Joints: Typical coverage is 25 – 35 sq. ft. (2.32 – 3.25 sq. m.) per bag.
- WEATHER
- Ensure that no rain is forecasted for at least 24 hours before and after installation.
- After activation, cover the area entirely if there’s a possibility of rain and promptly uncover it once the threat has passed.
- Temperatures must remain above 32°F (0°C) throughout installation and curing.
- CURING CONSIDERATIONS
- Continuous dampness can prevent polymeric sand from curing properly.
- Irrigation systems should be turned off until polymeric sand has fully cured.
- USAGE NOTES
Video
Our SimplyTough™ polymeric sand is the only jointing sand you need for all your hardscape and landscape projects. It’s simple to use, extremely durable, and easily activated to save you time and money.
Related products
Where can I purchase SimplyTough?
Can I install polymeric sand on a paver patio that already had polymeric sand installed?
What is the recommended way to remove polymeric sand between pavers?
How can residue from polymeric sand be removed from the surface of a paver?
If SRW Polymeric Sand is installed on my commercial patio, will it be safe for someone wearing high heels to walk on the joints?
Can a project be sealed after polymeric sand has been installed?
Once the Polymeric sand has cured for at least 28 days, you can clean and seal over the top of the project. We recommend cleaning the paver surface with PW Paver Wash prior to applying any SRW Sealer. We recommend cleaning a stone surface with SW Stone Wash and wetcast projects to be cleaned with WW Wetcast Wash.
Do you have additional questions? Contact us.